Central gas installation in Shuaiba Industrial starts with surveying main distribution lines and checking connection points at each production unit. We run pipes from the inlet meter through concrete foundations and pressure-test every joint before final commissioning.
Shuaiba Industrial buildings are workshops, tanks and storage sheds spread across large areas, and gas must reach each site at steady pressure without interruption. We assess distances from source to user points and choose pipe diameter based on expected load, because a narrow line causes pressure drop at the far end. Pipes are fixed to external walls and below ground with thermal expansion space, and sediment filters are fitted at distribution points.
Shuaiba Industrial lies in Ahmadi governorate, home to the KIPIC petrochemical complex and many other heavy facilities.
Every gas line in Shuaiba is pressure-tested at operating pressure plus a margin for one hour with no drop.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use an electronic gas detector to scan every joint and bend in the line, including spaces under floors and walls. Pressure testing catches large leaks first, then we sweep with a handheld detector at every connection point.
Yes, provided the new section is isolated with shutoff valves while we finish installation and testing. We connect the new line at a secondary distribution point and cut supply only to that new section during connection.