Main gas network laid and pressure-tested before walls are plastered.

Ahmadi
Central gas network installation in Wafra Agricultural starts by plotting the pipe route from the external regulator to each barn and storage shed. We lay copper or galvanized steel underground or along foundations and test pressure with electric equipment. We inspect every joint with soap solution before live gas commissioning.
Wafra Agricultural farms contain large poultry sheds, refrigeration units and packing plants spread across wide distances, and each building needs its own branch from the main gas line. We measure distances between structures and select pipe diameter to hold steady pressure at the furthest point. Sandy soil makes trenching and burial straightforward, but we protect pipes from sand movement with small concrete supports.
Wafra Agricultural lies in Ahmadi governorate and contains specialized agricultural production facilities spread across distances requiring an extended gas network.
Before handover, every pipe section is tested at 20 bar for ten minutes to confirm no pressure drop occurs.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We place short concrete supports every 1.5 metres under the pipe to prevent sagging and movement. Sand shifts with wind and irrigation, so anchoring pipes prevents joint separation.
If distances between buildings exceed 200 metres, we test pressure at the furthest point. If it drops, we fit a secondary regulator that automatically restores flow without compromising network safety.