Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom rough-in in Abdali starts with running hot and cold supply from the farm tank or pump well to every use point. We route pipes under solid foundations away from irrigation sources and test every joint before walls close. Drainage needs clear fall and sandy soil that permits deep trenching.
Abdali residential houses and their farm buildings sit in a border area near Iraq, with deep sand making underground trenching straightforward. Supply lines branch at the farm's own pump well, not relying on public network. Bathroom and kitchen drainage collects in a separate trap far from drinking and irrigation wells.
Abdali lies in Jahra governorate near the Iraqi border, a farming and residential area where self-sufficiency in water supply is fundamental.
Waste pipes are flushed with running water for one full hour before handover to ensure smooth drainage without blockage in sandy conditions.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we connect supply lines from the well head and install a filter before the bathroom if water is cloudy or mineral-rich. We test well pressure and yield first to confirm adequate supply.
We locate the drainage trap at least thirty metres from the drinking well, choosing a lower spot so waste is always geometrically downhill from the water source. We test water quality before and after construction.
