Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Apartment first-fix in Jahra Industrial focuses on high-pressure supplies and robust drain lines for factories and warehouses. We run main pipes from central water stations and mount them on elevated steel frames for periodic inspection. Every pipe is tested under elevated pressure before connection to heavy equipment and storage tanks.
Jahra Industrial factories consume large volumes of water for production and cooling, requiring a carefully distributed pipe network. We start by calculating water demand for each production stage then select pipe diameters that maintain steady pressure at every outlet. We fit isolation valves for each factory section so maintenance can happen without stopping full production. Drain lines need a sealed base with steady fall located away from electrical zones.
Jahra Industrial sits in Jahra governorate, a dedicated zone for factories and heavy-process facilities.
Cold and hot water pipes are run in separate routes because heating expands metals at different rates and may cause vibrations.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install main and branch isolation valves so one section can be shut down without affecting the rest. Each valve is clearly labeled showing which zone it serves, and staff are trained to operate them before handover.
Yes, because water quality differs; cooling water may contain sediment harmless to heat transfer but would clog production channels. We run a separate line with different filtration for each use.