Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first fix in Abdullah Mubarak needs precise understanding of where the main stacks run through the building. We start by reading architectural drawings then mark bends and reducer positions. We carry water and waste across flat floors and ensure correct fall at every point. Final pressure confirms every joint is sound.
Abdullah Mubarak buildings are typically mid-rise residential with studio and two-bedroom units. Main stacks are often placed near Abdullah Mubarak Co-op away from the residential blocks, meaning long supply runs from the riser to each unit. We calculate available pressure at the furthest apartment and choose pipe diameter that keeps flow adequate. Kitchen and bathroom waste run together down one tight chase before reaching the main stack.
Abdullah Mubarak lies in Farwaniya governorate, a residential district on the Sixth Ring Road.
We record pressure reading for each unit separately during testing because long supply lines cause pressure drop.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the original supply pressure from the authority is adequate, we do not add a pump at this stage. We record the test reading and leave it to the owner to add a pump later if needed.
The main supply may be half-inch, but each unit needs only quarter or three-eighths inch. We fit a brass reducer at the unit inlet to step down diameter and save materials and cost.
