Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first-fix in Ardhiya Industrial starts with running water and waste lines through the concrete frame before walls close. We plot columns and footings, then lay pipes with proper fall from the roof tank to ground level. Every line is pressure-tested before plastering begins.
Apartments in Ardhiya Industrial buildings are often stacked in residential towers above warehouse and office space, which means vertical water lines run through tight chases between units and a common waste stack drops at the building corner. We run supply pipes with welded bends from the tank location and connect each unit to its own branch before pressure testing the lot.
Ardhiya Industrial lies in Farwaniya governorate, a mixed-use zone combining residential units with warehouses and light manufacturing.
Every line runs at 6 bar for 10 minutes with zero leak before the next construction phase is cleared.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use copper tube with welded bends at sharp angles to save space. Vertical supply runs pass through shared chases at column corners and only enter units at bathroom and kitchen points.
We isolate the section and inspect every joint separately with a pressure gauge. Bad joints are uncut, cleaned and remade with fresh tape or replaced pipe if needed.