Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Apartment pipework in Bnaid Al-Qar starts with checking main supply lines from the meter and tracing waste routes under the slab before concrete sets. We lay copper and plastic pipes through exterior and internal walls, install distribution boxes and await pressure test results before any wall closes.
Bnaid Al-Qar apartments are usually in modern tower blocks with regular grid layouts and raw concrete slabs, which means pipes run in straight lines with steady falls. We begin at the meter room and split into separate supply lines for the kitchen, main bathroom and guest bathroom, each with its own isolation valve. Waste needs a collection point under the slab near the building's central pump station, and this location is set before work starts.
Bnaid Al-Qar lies in Kuwait City near the old airport road, a district of tall residential towers where pipework must be laid before floor slabs are poured.
Every supply line is tested at 10 bar pressure for at least 30 minutes before walls close because fixing a leak later means breaking concrete and tile.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fill each waste line with water and leave it overnight, then measure the drop in level to detect any seepage. If the level stays constant, the line is tight and safe to cover.
Moving it means rerouting waste pipes under the slab before the concrete set, which delays the schedule and adds cost. Best to fix the location in the initial plan with the engineer.
