Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Bnaid Al-Qar faces high humidity near the beachfront. We run supply lines from a protected tank through corrosion-resistant pipes. Waste must be fully sealed to prevent seepage into the foundation. Intensive testing precedes any final finish.
Homes on the old airport road near Bnaid Al-Qar beach face high salt humidity that corrodes iron. Copper and brass pipes withstand salt better than galvanized steel. Supply lines must pass through plastic ducts inside walls instead of direct contact with concrete. Waste needs larger diameter because standing water leaves more deposits in humid climates. Inspection points must be easily accessible for cleaning pipes of salt residue.
Bnaid Al-Qar sits on the beachfront of Kuwait governorate, a coastal district where humidity and sea salt are primary architectural factors.
Copper pipes are tested by passing a mild acid solution to detect any microscopic cracks that could cause slow leaks later.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In Bnaid Al-Qar yes, sea salt eats galvanized steel quickly. Red copper lasts 50 years or more in salt, and brass is also good. Cost is higher but lifespan is longer and maintenance less.
We encase pipes in plastic ducts isolated from humid air as much as possible. We use brass fittings instead of iron, and wrap rubber insulation around each joint to prevent direct moisture contact. This cuts corrosion significantly.
