Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Pipe runs for apartment first-fix in Hassawi start with a floor plan review to map supply and waste from the meter to every outlet. We lay supply and drain pipes through the structure, test under pressure and leave the apartment ready for plastering.
Hassawi apartments are typically in mid-rise blocks with one or two basement levels, meaning supply comes from the building base or the meter room near Hassawi Co-op. We measure every supply and waste run, select pipe diameter by fixture count and flow rate, and clip pipes every metre to stop vibration. Drainage always needs steady fall toward the main stack in the basement.
Hassawi sits in Farwaniya governorate, an established residential area where prefabricated concrete buildings with known basement layouts are the norm.
Every supply line is pressure-tested at 10 bar for at least one minute before handover sign-off.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we space them at least 15 centimetres apart to avoid heat transfer and odour cross-over. Supply always runs above drain in the same wall.
Right after walls close, before any other finishing. We pressurize every supply and drain circuit and hold it to check for leaks across the whole network.
