Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Farwaniya
First-fix plumbing and electrical in Hassawi requires careful planning before concrete and render go down. We run hot and cold water pipes and waste lines alongside electrical ducts and telecoms conduits. Every route is marked on the engineering drawing before work begins. Pressure and insulation are tested before any wall closes.
Hassawi consists of modern family villas and multi-storey housing projects near Hassawi Co-op. New buildings need even distribution of water and electricity across several floors and open areas. We run copper pipework clear of electrical stress and space it to building code. Sanitary drains must fall steadily from each unit to the main manifold.
Hassawi sits in Farwaniya governorate, a fast-growing residential zone where new housing units are built at high density.
Every water line is pressure-tested at 10 bar for one hour before render, because leak repairs after walls close are costly.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We maintain a minimum 30 cm gap between water pipes and main electrical ducts. Every section is drawn on the plan before starting and mechanical separation is fixed in place.