Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Hassawi begins by running hot and cold supply from the main meter to every outlet before walls close. We size the pipes to the available pressure and test all lines under maximum flow before sealing. We connect waste with a steady fall to the vertical soil stack and confirm no water traps under the slab.
Most Hassawi houses sit on concrete piles at a fixed height, leaving tight under-floor space for waste runs. We calculate the fall from the bathroom slab to the soil stack entry, often raising the pipes slightly to clear the supports without sharp bends. Where headroom is very tight, we use smaller-diameter pipes or raise the bathroom floor level slightly to give the waste its natural descent.
Hassawi lies in Farwaniya, an older residential district defined by houses built on raised concrete pile foundations.
Supply lines are pressured separately to 3 bar for three hours as a tight-seal test before handover.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate the waste fall from the bathroom to the stack entry and raise the pipes slightly to clear concrete supports. If space is extremely tight, we choose 75 mm PVC instead of 100 mm to maintain the proper gradient.
No, the lines must be separate to prevent heat loss from the hot water and avoid back-pressure effects. We run them side by side with thermal insulation on the hot line only.