Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Pipe runs laid right before walls close in Jaber Al-Ahmad City covers supply lines from the development main and waste to the network. We lay the tubes, set isolation and flow points, then test each section separately under documented pressure.
Jaber Al-Ahmad City's new blocks are large and closely spaced, with supply lines running through shared service risers in each tower. We calculate pressure needed at the top flat to ensure enough flow even during peak times. Waste drops through internal stacks then branches horizontally to shared collection columns, leaving cleaning access at ground floor.
Jaber Al-Ahmad City sits in Kuwait governorate as a planned new housing project where pipe runs must coordinate with other utilities.
In tall residential towers we pressure-test supply lines dynamically with taps open on ground and top floors simultaneously.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install pressure tanks and pressure-reducing valves where the supply enters each tower. We test pressure under full load by opening multiple taps together to confirm balance.
We size the pipe diameters based on unit count and number of fixtures. We verify the final connection to the city network handles peak load without backup.