Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
In the new Jaber Al-Ahmad City development, we install hot and cold supply and waste distribution in villa bathrooms before final construction. We select pipe routes matching the project's engineering layout and ensure full coverage of every fixture point.
New buildings in Jaber Al-Ahmad City sit on reinforced concrete slabs with engineered ceiling systems, so rough-in must run beneath the slab with precise plans. We lay main pipes through the slab before final pour, coordinating with construction crews on reserved joints and openings. Each waste line must reach the main stack with safe fall without crossing other services.
Jaber Al-Ahmad City in Kuwait governorate is a new residential development project hosting villas and commercial zones.
Before the final concrete pour, each pipe is tested with compressed air to find any small holes.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Relocating after pour means breaking concrete and running new pipes at high cost and disruption. That is why we fix positions before pouring and get owner approval on the layout.
Each bathroom waste drops to an internal stack in the villa, and that stack connects to an external line to the municipal sewer network. We ensure the external line has adequate fall and access points at critical bends.