Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Ahmadi
Pipe-run layout in Mangaf apartments requires extending water lines from the main stack to every unit and precise pressure verification before plastering begins. We work on bare concrete frames, fix pipes with steel brackets, and test each circuit under full load before walls close.
Mangaf homes are compact towers with two to four-bedroom units, each with a main bathroom and secondary toilet. These tight layouts need short runs from the riser to every bathroom, with kitchen lines run under the floor slab before the final concrete pour. Negative gradient ensures the rear bathroom drains without water pooling in pipes, and greased copper joints stay tight under years of high pressure.
Mangaf sits near Mangaf Co-op and adjoins Abu Halifa industrial area, a densely populated residential district.
Kitchen lines are tested at sixteen bars because sub-slab pipes cannot be inspected after concrete sets.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Very limited. The sub-slab line cannot be moved without breaking concrete and tile. We fix the final position just before the pour, after the family agrees.
At least twice: once after every joint is made, and again just before closure at thirty bars. A third test runs on each floor after taps are fitted.
