Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Ahmadi
Apartment first-fix plumbing in Fahad Al-Ahmad starts from the moment the raw concrete structure is handed over. We run supply and waste lines from the main riser and pressure-test before walls close. Each joint is checked carefully for leaks. The apartment leaves plumbed and ready for tiling.
Fahad Al-Ahmad apartments are typically built three storeys per building block, each unit with a kitchen, master bathroom and guest toilet. Main water risers run through the central service core and waste drops to the underground sewer. We run pipes from the core to every outlet and check fall angles in waste lines before concrete pours and roughing. Metal and plastic pipes are laid in prepared chases away from reinforcing rods.
Fahad Al-Ahmad lies in Ahmadi governorate, where apartments are built closely in blocks with shared water and sewer systems.
Every supply line is pressure-tested at 6 bar for at least one hour before walls are closed.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fill each line and monitor pressure for a full hour, and any drop means a weak joint we remake at once. After testing we drain and wait for the route to dry before concrete pours.
No, we cap every outlet with temporary plastic plugs to keep concrete and debris out. We remove them after concrete sets and inspect pipes from inside.