Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Pipe runs laid right before walls close in Mubarakiya Camps begins with marking tube routes on the initial building plan. We run supply from the central source and connect waste to the public network, then pressure-test each unit fully.
Mubarakiya Camps buildings are older barracks redeveloped, with concrete floors often flat with no natural fall. We carefully determine the waste downslope and fit slightly larger-bore waste pipes to compensate for shallow fall. Supply lines run alongside the stairwell wall and branch to each flat with separate isolation valves.
Mubarakiya Camps lies near Mubarakiya market in central Kuwait city, a densely built area where drainage depends on saturated public sewers.
Before closure each unit is pressure-tested at steady pressure for one hour and any pressure drop is logged on an approved form.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We raise the waste entry point slightly or use larger-bore pipes that flow well even on shallow fall. We test the waste with full water before closing to confirm no pooling.
Yes, we fit a separate isolation valve for each flat after the main meter. Each valve is labeled with the unit number and sits in an accessible, marked location.