Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
First-fix piping in Dasman starts before wall and ceiling closure on a new apartment. We run hot, cold and waste lines from the main riser through floors and wall chases. Every pressure and leak point is tested before walls are plastered. The apartment is then ready for the finishing plumber.
Modern Dasman apartments near Dasman Palace are often in tall residential towers with multiple bathrooms and tight kitchen layouts. These designs mean water lines must rise through isolated risers in internal walls and reach every fixture with a constant fall. We map pipe runs from the distribution board on the ground floor and route tubes around structural obstacles. Waste from bathrooms and kitchen drops to central soil stacks built into the external walls.
Dasman sits on the Arabian Gulf shoreline in Kuwait governorate, an area that has grown rapidly with modern high-rise towers and luxury apartments.
Every water line is pressure-tested at 10 bar for two hours before wall closure because fixing leaks after construction is harder and more costly.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We pull copper or plastic tubes through drilled openings in concrete walls, then secure them with strong couplings along the run and test pressure before plaster covers them. Every joint is visible and inspected before the pipes are concealed.
If a small leak appears in a joint during initial use, we return and disassemble that section, retest pressure and identify the faulty coupling. Properly tensioned copper pipes do not lose pressure if they passed the site test during construction.
