Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Farwaniya
Pipe and electrical routes in Rehab start with blueprint reading and path agreement before concrete pours. We mark where water, drainage and power runs will pass so they do not cross or obstruct each other. Each route is plotted on site before walls close. Handover includes pressure test and insulation certificates.
Rehab's modern residential houses are built on two or three storeys with central water and drainage systems, meaning vertical routes run through load-bearing columns and walls. We lay cold and hot water pipes together in one chase and keep sewage lines separate to prevent odours and damp. Electrics run in separate ducts away from water, and testing happens before any wall closes.
Rehab lies in Farwaniya governorate, a modern residential development area where villas and apartment blocks are built to standard specifications.
Every water line is pressure-tested at 10 bar for one hour before backfill and construction begin to catch any leak early.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use engineering drawings to reserve separate zones: water and drainage on the east side of the wall, electrics on the west. Every route is photographed before closure.
Water pipes are pressure-tested at 10 bar before plastering begins, and drainage pipes are tested with running water for three hours. Delays past this stage make fixing any fault very difficult later.