Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Farwaniya
Kitchen first-fix in Rehab starts with precise survey of the kitchen layout and marking supply, waste and vent routes before concrete is poured. We lay hot and cold pipes, waste and vent lines, pressure test them fully, then close the walls with finishes.
Rehab houses are typically two or three storey villas with kitchens opening onto living areas, meaning the waste line must reach the main floor trap with steady fall and no sharp bends. We chalk out all pipe routes on the slab before starting and fix anchor points to the foundation so waste is easy to access for repairs later. Where the kitchen sits far from cylinders or roof tank, we plan an extra supply run through side channels.
Rehab lies in Farwaniya governorate, a family residential area where most houses have separate kitchens with load-bearing walls.
Every waste line is tested with sustained water flow before walls close to confirm no blockage or early leakage develops.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate the available fall along the path and choose the shortest route under floor or through side channels. If fall is insufficient we propose raising the sink outlet or using a larger diameter waste pipe.
Repositioning after concrete is poured is very difficult and needs walls or floors demolished. That is why we confirm every route with the contractor and owner before work starts.
