Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Apartment pipe runs in Shuwaikh start by lifting copper tube from the water meter up through raw concrete walls. We lay hot and cold supply lines and waste together, then pressure-test at 7 bar before any wall closes. The work ends with marked, ready-to-plaster runs.
Shuwaikh apartments are mostly older stock, built on heavy concrete walls and thick slabs. We need precision laying the waste runs because the existing slab leaves a tight fall margin. We measure from the main collection point near the central water station and run pipes steadily, dropping roughly 15 centimetres over every 3 metres. Hot water testing reveals any joint fracture before walls close.
Shuwaikh lies on the eastern shore of Kuwait governorate, where central water treatment plants feed the district's apartments.
Every hot water distribution point is tested with 70-degree water to confirm pipe insulation before handover.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate fall from the furthest bathroom point to the main stack and choose pipe diameter and regular pitch accordingly. Where space is too tight, we use horizontal channels with aeration outlets to ensure proper water flow.
Cold line is tested at full 7 bar, and hot line at 5 bar only to avoid stressing thermal insulation joints. Each test holds for 20 minutes to confirm stable pressure and zero leaks.
