Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first fix in Shuwaikh starts with reviewing the kitchen layout and where the sink, fridge and cooker will sit. We run hot and cold supply lines from the main meter, position the waste under the sink and pressure-test everything before walls close.
In Shuwaikh's older and newer apartment blocks the waste route varies by bathroom location, but is usually close through a shared wall. We find the shortest run from sink to main stack and lay pipe at a steady fall of at least 2 percent, checking the vent line because a sink without it traps air and brings smells. We insulate hot lines to cut heat loss and noise before any suspended ceiling goes up.
Shuwaikh lies near the Kuwait Science Museum, a mixed district of older and newer residential and commercial buildings.
Every supply line is pressure-tested at 10 bar for 10 minutes because Shuwaikh's high water pressure reveals leaks right before walls close.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we calculate fall precisely and test flow with real water before walls close. A long floor run under the slab is harder to access later if a blockage happens.
We run the waste with a steady fall and fit an air admittance valve instead of relying on a distant stack. This ensures proper drainage and prevents smells backing into the sink.