Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
Pipe and wire routes in Shuwaikh are laid before concrete floors are poured to avoid breaking them later. We map distribution runs from the main panel and connect feed points on each floor before drywall closes the walls.
Most new residential projects in Shuwaikh are blocks of five to ten storeys with compact units and family apartments, which means pipe routes need precise heating and drainage isolation in each unit. We run hot and cold water pipes through the lower-floor ceiling then rise them vertically in hidden risers instead of outer walls. Drain lines need steady fall to a single central stack, so we check every pitch before the pour to ensure water flows without trapping.
Shuwaikh lies near the Kuwait Science Museum, a mixed-use development zone of new residential projects alongside industrial zones and logistics services.
Before concrete decks close we run pressure tests on every water line and do not close walls until the engineer signs off.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Supply pipes run in isolated ducts inside ceilings with regular maintenance of joints and packing. We connect each fitting with stainless clamps and coat the threads with sealant compound before tightening.
No, electricity and water require separate ducts with a minimum 15cm clearance to prevent leaks and faults. We plan routes on one drawing but execute them in separate channels.