Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Pipe runs for first-fix apartments in Sulaibiya Industrial differ because of hard ground and industrial moisture. We lay pipes in raised conduits, seal every opening carefully and pressure test to higher standards than residential.
The industrial zone has factories and warehouses alongside residential blocks, and soil is heavily compacted by machine and truck traffic. Water and waste pipes run through raised plastic conduits above ground for ease of inspection and maintenance, because soil may settle irregularly. We test every joint at twelve bar instead of ten because industrial conditions are harder on fittings.
Sulaibiya Industrial lies in Jahra governorate extending toward the border, where factories, warehouses and worker housing concentrate.
After full installation, water is drawn from the furthest supply outlet to check clarity and stable pressure.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Compacted soil in the industrial zone may settle unevenly because of equipment traffic, which loses drainage fall. Raised pipes stay in fixed position and make every joint easy to inspect.
Yes, because vibration from factories and machinery places extra strain on fittings and pipe walls. Testing at twelve bar proves pipes hold both pressure and vibration movement without leaking.
