Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Apartment pipe runs in Surra begin at the main meter near Surra Co-op and rise through sturdy concrete columns. We lay copper for hot and cold water and waste at calculated routes, with full 7-bar testing before any wall closes. Every joint is insulated and marked by fluid type.
Surra apartments are spacious and upscale, built in tall towers on Fourth Ring Road. These units need multiple hot-water points in master baths, guest baths and service areas. We run separate feed lines from the central heater to each outlet and test each independently for hot-water leaks. Waste connects from multiple points to the main stack at steady fall, with vent pipes protecting trap seals.
Surra sits on Fourth Ring Road in south-east Kuwait governorate, a prestige residential zone of modern towers.
Every hot-water line is tested with 60-degree water for 15 minutes to verify thermal insulation efficiency.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We run completely separate lines from heater and cold supply to each tap, joining them only at the final outlet with a thermostatic mixing valve. Each line is tested separately before the mixer is connected.
We apply 25mm foam insulation on hot pipes in living areas and 35mm where they pass through open or cool zones. This maintains temperature and cuts heat loss over long runs.
