Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
First-fix plumbing in Sawaber serves dense high-rise towers in the city centre near Al Sawaber Complex. Pipes traverse complex concrete frames with varied partition patterns. We chart pipe routes precisely before cutting and test pressure and flow after each section. Full documentation is vital because maintenance later will be difficult in packed buildings.
Apartments in Sawaber near the commercial complex range from studios to large family units in a single tower. Varied floor plans mean pipe routes do not repeat, so each level is designed separately. Some units have two bathrooms and others one, so trap counts vary. Concrete ceilings are 30cm thick and tolerate drilling for pipes easily, but every hole location must be marked on precise plans before work begins.
Sawaber lies in Kuwait governorate amid the dense residential zones of the city, where modern towers concentrate.
Pressure tests are split into separate horizontal stages because floor variety means one line may serve multiple units of different sizes.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We draw each floor separately before submission. We calculate diameters and falls for each individual branch and test pressure and flow before moving to the next level. Plans record every variation.
Yes, the rising main is sized by total demand from floors above it. If level three has three units and level four has two, the pipe diameter steps down at level four.