Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first fix in West Abdullah Mubarak starts from the engineering plan and needs coordination with the construction crew. We run water lines from the main source and branch them to each unit. We cut waste channels on steady fall and pressure-test before walls. Any error at this stage becomes expensive later.
Buildings in West Abdullah Mubarak vary in height and size, from family homes to residential towers. Deep foundations and raised floors mean waste lines must drop unbroken from upper storeys to the main stack on the ground level. We check the main waste entry point before starting to cut. If the main stack sits at the far corner of the building, we need a long horizontal run under the floor that passes clear under columns and other services.
West Abdullah Mubarak lies in Farwaniya governorate, a residential district between the Fourth and Sixth Ring Roads.
On the ground floor we inspect every horizontal waste joint before it is covered with sand because reopening it fractures copper pipes.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate fall precisely and ensure every meter of horizontal pipe drops at least half a centimeter. We use a level and string to check fall before sealing.
Yes, but waste must always sit below the water line with at least five centimeters clearance between them. This prevents contaminated drain seepage into the drinking line.