Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix plumbing in Ardhiya Industrial starts before foundations are poured, with a full layout of supply and drain routes from the contractor's drawings. We mark the pit and roof tank positions, run vertical and horizontal mains, test each section with water and seal nothing until all is verified.
Most factories and warehouses in Ardhiya have thick concrete floors and simple bearing walls. We run cold and hot mains and drains under the slab before it is poured, and leave marked openings for later equipment connections. Where there is a separate plant room we fit a main drain manifold with inspection points ready for flow and blockage testing.
Ardhiya Industrial lies in Farwaniya governorate, where factories and warehouses with heavy water loads and continuous discharge demand robust early plumbing layout.
Each section of the line is air-pressure tested after pouring and before machinery runs, because reopening poured foundations costs far too much.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but with a protective cover over them and steady fall maintained. We measure distance and height to ensure inspection and cleaning later from a lower access point.
We leave extra capped openings under the slab per the contractor's estimate. When plans change we open the right hole and reconnect the pipe without breaking the main concrete.