Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix plumbing in Rehab starts weeks before walls close, when concrete frames are open and tilers have not arrived. We run distribution lines from the main meter to every bathroom and kitchen, connect drains under floor slabs with calculated falls. Every joint is pressure-tested with air before any wall is sealed.
Rehab's modern residential homes typically rise two or three storeys, each needing separate hot-and-cold supply routes and drains that flow steadily toward the main sump. We review the contractor's drawings before starting and plot pipe routes clear of reinforcement bars, because cutting later slows construction. Waste from upper bathrooms can drop through interior walls or run around the exterior perimeter depending on the building layout.
Rehab lies in Farwaniya governorate, a family residential zone where villa and house construction continues steadily.
Every distribution branch is pressure-tested at 6 bar for 15 minutes before walls close because fixing leaks later means breaking new tile.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We map each pipe route before drilling, using interior walls for vertical runs and planning horizontal sections under slabs with steady falls. Vertical lines run in central stacks or in isolated chases built into wall cavities.
We test pressure and drainage with real water for hours right before walls close to confirm no leaks exist. Testing after handover means breaking new tile if a fault appears.
