Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix plumbing in Ardhiya Warehouses focuses on large supply lines and deep drains covering vast floor areas. Warehouse offices need working bathrooms and water stations while large spaces require multiple strategically placed floor draps. We calculate pressure needed to reach the furthest point before the ceiling closes.
Ardhiya Warehouses are industrial buildings with high ceilings, open floor areas and deep floor drains for washing and cleaning water. The administrative office sits in a corner with a separate bathroom and cold-water station. The main supply line enters from the street and branches to the workers' sink, office and floor drains near the loading zone.
Ardhiya Warehouses is an industrial zone in Farwaniya governorate, served by Farwaniya's central water networks.
Before handover, we test water flow from the supply point to the furthest floor drain to confirm pressure remains adequate after friction losses.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we choose larger pipe diameter because each drain adds flow. We calculate expected discharge from washing and cleaning, then add a safety margin before finalizing the diameter.
If the main drain line was designed with excess capacity, a new drain can connect provided the fall stays steady and pipe does not exceed its maximum. We inspect the existing line first to confirm.