Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix plumbing in Shadadiya starts with digging supply and drain trenches beneath the new house foundation before concrete pours. We run cold and hot lines from the district meter and connect drains to the municipality network with constant fall gradients. Every joint is air-pressure tested before walls close. This prevents hidden leaks trapped under plaster later.
Shadadiya new-build houses typically sit on large plots with reasonable distance from the district street, and main supply lines need long runs from the meter to the gate. We mark the route on the ground before excavating and avoid existing foundations and electrical ducts. Drain lines are laid at a minimum fall of one in a thousand to ensure water and sediment move together toward the underground pit without stalling or blockage.
Shadadiya lies in Farwaniya governorate and is a developing residential area where most houses are newly built with completely new plumbing systems.
Every supply and drain line is tested under air pressure for ten minutes before acceptance because buried faults cost too much to fix.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a laser level or tight string between two points to measure the fall precisely. We record every meter to ensure no flat spot blocks flow and no steep section separates water from sediment.
We raise the line slightly or move the pit connection point to avoid breaking it. In some cases we sleeve the stressed section with protective pipe. Every change is noted on the final as-built drawing we hand to you.