Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in in Jaber Al-Ali requires running a unified network from the plant room to every fixture. We install copper pipes for hot and cold water and waste lines with steady falls. Before final finishing, each joint is tested under high air pressure. This protects the bathroom from leaks and blockages for the life of the house.
Most Jaber Al-Ali houses have a main bathroom and a separate guest bathroom, each needing its own floor drain with independent fall to the main waste line. We measure the distance from each bathroom to the main stack and choose pipe size and material based on that distance and expected load. If a distant bathroom needs a long gradient, we use larger diameter to prevent settlement.
Jaber Al-Ali sits in Ahmadi governorate, a suburban district where most villas follow similar layouts, which helps with advance planning.
Every floor drain is tested with direct water flow before the slab closes to ensure the waste path is clear.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
They can share one waste line if they sit at the same level or close to it, but the line must be at least 75 mm diameter to handle flow from both traps. If the drains sit at different heights, a separate line is safer.
We slope the pipe continuously upward from the drain to where it meets the main stack, ensuring water flows without trapping. If the height difference is large, we use a 45-degree branch instead of a 90-degree bend.
