Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Ahmadi
First-fix plumbing and electrics in Jaber Al-Ali requires precise coordination because the residential towers here have many storeys and numerous bathrooms. We plan vertical pipe routes in columns and load-bearing walls, installing pipes and wires before concrete pours and tiling.
Jaber Al-Ali tower blocks are modern with multiple units per floor, each unit having an open kitchen to living space, a master bathroom and a guest toilet. Hot and cold supply and waste lines must run vertically between storeys in steel columns or reserved concrete beams. We record pipe routes on amended drawings and test each branch before the build moves to assembly and cladding stages.
Jaber Al-Ali sits in Ahmadi governorate, a medium-density urban development of multi-storey residential blocks.
Every waste branch in a floor is tested with compressed air before joining the main vertical stack because hidden joints are hard to repair once built.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We reserve spaces in concrete beams or use hollow steel columns before concrete is poured. Each floor has short horizontal waste branches that slope toward the main vertical stack in the centre.
That is why we test each section before pouring and record routes on updated drawings. If an error occurs, cutting open concrete is very costly and delays impact the project schedule.