Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom rough-in in New Jahra calls for routing through thick concrete foundations and longer runs from central supply points. We pull hot and cold lines under the slab in protected conduit and establish waste points with unbroken falling gradients. Before final construction, every joint is tested under full pressure.
Modern houses in New Jahra sit on large plots with wide gaps between bedrooms, kitchen and bathrooms, so supply runs are longer and pressure drops at distant points. We choose pipe diameters carefully and install isolation valves in each zone to manage flow. Near New Jahra Co-op, standalone villas with multi-storey bathrooms are common, requiring close attention to waste gradient from first to second floor.
New Jahra sits in Jahra governorate, a villa district where waste runs beneath thick concrete foundation are deeper and slower-draining.
We test drainage with continuous flow for ten minutes to confirm no blockage or air lock forms in lines beneath the foundation.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Heavy foundation prevents any pipe movement after occupancy, so shallow fall can cause pooling. We increase gradient to 1 in 40 or steeper to ensure constant and fast flow.
Not if installed correctly downstream of the main distribution board. Each zone maintains independent pressure. We test both bathrooms together and alone to confirm isolation.
