Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Jahra
Summer heat in the new blocks near New Jahra Co-op shapes first-fix plumbing and electrics from the start. In Jahra, air conditioning circuits and condensate drains are planned for every room at first-fix, and any water pipe crossing the roof is insulated and shaded.
New Jahra houses are built on fresh plots with split air conditioners in almost every room, and each unit needs its own circuit, an outdoor isolator and a condensate line that falls to a drain rather than onto the yard. Roof water pipes between the tank and the stair core can reach scalding temperatures in July, so first-fix runs them inside the building where possible and wraps any exposed length. Dust is the other factor: conduit ends and pipe openings are capped until second fix.
Jahra (New), in Jahra governorate near Jahra Mall and Jahra Hospital, is a growing inland district of new family houses.
Water pipes left exposed on a Jahra roof in summer deliver hot water from the cold taps.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually because the supply pipe crosses the roof in the sun. Routing it inside or insulating it at first-fix keeps the cold line cooler.
Yes. Each split unit needs a circuit, an isolator and a condensate drain, and all three are far easier to conceal before plastering than after.
