Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Nuzha handles modern villas with insulated floors and visible runs. We plan every tap and drain point before work starts and route copper and plastic pipes in neat paths under slabs and within walls. Every joint is sealed with heat or thread before final testing.
New Nuzha villas often have multiple bathrooms in different styles, such as a large master suite with premium fixtures and a small guest bath with standard pieces. We route supply from the roof tank and heater so hot water reaches each bathroom quickly with no lag. Waste pipes are sized to load, so the master bath may need 110 mm pipe while the guest uses only 50 mm.
Nuzha in Kuwait governorate near Nuzha Co-op is a modern villa district built to high construction standards.
Before handover, pipes are filled with water and pressurised air for 24 hours to ensure no joint leaks under sustained stress.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but the internal walls must have adequate chases left before pouring concrete. We document every pipe route on a detailed map because you will need it for any future repair or modification.
Yes, we recommend an isolation valve for each bathroom so you can stop water to one without affecting the other. Valves go in the ground cupboard or distribution board where they stay accessible.
