Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Kuwait City starts with precise pipe routing before walls are built. We run hot and cold supply and waste to every fixture point and test pressure and flow. Correct rough-in now prevents wall and floor leaks later.
High-rise flats and apartment blocks downtown near the Grand Mosque need tight pipe routing because walls are shared and concrete foundations are thick. We map vertical runs in columns and horizontal routes under floors before topping concrete is poured. Back-to-back bathrooms in these units mean we need tight spacing and must avoid pipe crossings that make later maintenance difficult.
Kuwait City is the capital and commercial hub, where most bathrooms are in closely stacked residential units requiring extremely precise rough-in design.
Before walls close, every line is filled and pressurised for one hour to confirm no hidden leaks exist.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We raise one waste line above the concrete slab and lower the other below it, or offset one to the side before pouring. Every route is marked on the timber formwork so the concrete crew sees what to avoid.
Moving the bathroom after pouring means breaking concrete and running long lines under floors or on walls. It is better to confirm position before rough-in starts to avoid rework costs and future defects.