Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in NW Sulaibikhat focuses on balanced pipes for mid-rise residential towers. We connect cold and hot water from main stacks and run waste at steady fall before walls close.
Mid-rise apartments in NW Sulaibikhat have bathrooms distributed on different axes per floor, and we must route pipes without hitting structural steel. We coordinate with the architect to find safe runs through beams and decks, using flexible pipes in tight spots. Each bathroom branch is pressure-tested at 6 bar before plastering and tiling.
North-West Sulaibikhat sits in Kuwait governorate and is a residential neighbourhood of medium-rise apartment buildings near the Fourth Ring Road.
Waste stacks in apartment blocks are tested with simulated flow matching six bathrooms running together because peak load occurs at morning peak.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, shared vertical stacks are standard in blocks. Each bathroom branch enters the shared stack at 45 degrees and we test the whole system at high flow to ensure no blockage.
We use copper pipes instead of plastic and mount them with brackets fitted with rubber pads. We wrap waste pipes with acoustic insulation especially near neighbouring walls.
