Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Mubarak Al-Kabeer
Bathroom rough-in for worker facilities in Sabhan Industrial needs durable pipework and fast flow rates. We run hot and cold water in larger gauges to handle high demand, and main waste drains at steady slope toward the underground sump. Every shower room gets tested by filling baths and toilets together to confirm there is no bottleneck. Each joint is marked before covering so staff know where everything sits.
Warehouses and factories in Sabhan need shower rooms and changing areas for dozens of workers, which means heavy-duty waste drains that handle peak morning and evening flow. We design separate waste runs for showers, toilets and kitchen so one does not choke the other under high load. We survey the underground sump location and intermediate traps first, because long waste lines may need larger pipe sizes and vent stacks at higher points.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate, a zone dedicated to large-scale factories and warehouses.
Communal showers require minimum 110mm waste pipes because peak flow demand is high.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We separate waste runs by type and calculate each gradient to carry peak flow without backup. Access points are set between each pipe stage so blockages can be cleared quickly later.
Yes, if the site is near average ground level. We install a submersible pump inside the sump that runs automatically when level rises, pushing waste to the main collection line.
