Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Rabiya requires precise pipe planning before concrete pours or walls rise. We install hot and cold supply and waste beneath the floor, testing every joint at high pressure. Steady slope and correct diameter prevent water pooling or blockage. A wisely roughed-in bathroom runs for years leak-free.
Houses in Rabiya residential area mix old and new, sharing rooftop-mounted tanks. Each bathroom needs two separate lines from the tank and one waste line. We measure the distance from tank to the farthest tap and size the pipe by length and expected pressure. The waste line must slope steadily toward the floor trap without stagnation or sharp rises. We test each branch with pressurised water immediately after installation to catch any leak from brass joints or flanges.
Rabiya sits in Farwaniya governorate, an upscale residential area where homes need reliable and safe water and waste services.
Every pipe is filled with water and left overnight before draining to confirm no slow leaks from old-style joints.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, copper withstands heat and pressure without corrosion, while galvanised can degrade quickly with hot water. We use 15mm copper for the hot line and 20mm for the cold line.
We fit a simple strainer at the drain outlet to catch hair. Weekly we advise pouring hot water before use to dissolve any grease deposits. We test the drain from the start at high water pressure to confirm adequate diameter.