Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first-fix in Rabiya starts with understanding ceiling heights and varying concrete floor levels. We run supply lines from the main entry while accounting for height differences between units. Each pipe is pressure-tested before walls and ceilings close.
Rabiya residential blocks in a traditional family area have natural height variations between units, especially where different wings meet. This means waste lines must keep steady fall despite variations, and supply lines may need pressure reducers to offset height differences. We run copper pipes with adjustable brackets to accommodate any unexpected level change during construction.
Rabiya sits in Farwaniya governorate, a family residential area of medium-rise blocks with narrow streets.
Waste pipe fall is checked every 30 centimetres to ensure no low spots trap standing water.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fit extra pressure reducers at set points during testing. If the difference is very large, we may split supply into two zones with a separate inlet for each floor or unit cluster.
We use thin copper pipes in smaller bore through these gaps, with clips close enough to prevent vibration. Each branch is tested separately before full system pressure testing.