Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Farwaniya
First-fix plumbing and electrical in Rabiya starts with site inspection and the main riser, which may be shared between homes or individual. We run vertical lines through multi-storey buildings and horizontal lines at each floor before visible pipes and fittings are installed. Pressure and insulation testing is done per floor separately.
Rabiya homes vary in height and size, ranging from two-storey villas to older three-storey buildings and modern blocks. Vertical pipe runs stay within outer walls or dedicated shafts to preserve internal space. Waste lines drop steadily across floors toward the main trap below the building. Electrical conduits run alongside pipes but in separate zones to prevent interference. We test each floor when complete before moving to the next.
Rabiya is a residential area in Farwaniya governorate where mixed-height buildings are common and closely spaced.
We test waste lines by pumping water from the top floor and checking uninterrupted flow at the main trap below.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We choose one or two main shafts depending on the number of stacks and extend them from roof to base. Each floor takes a branch from the shaft at the same relative height to ensure constant drain slope.
Yes, if we leave end caps on main waste lines during installation. Each cap is documented on the construction plan for easy access when adding a new storey or extension.