Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom rough-in in Taima faces sandy soil conditions and long distances from the main sewer line. We extend water lines in larger diameters and route them through pipes protected from sand and heat. Waste needs larger diameter too to ensure fast drainage before water is lost to sand.
Taima houses on Jahra's desert outskirts near Taima Co-op often rely on private wells and large tanks, and supply runs must carry water over long distances without pressure loss. We route thick copper pipes inside polyethylene sleeves to prevent corrosion from sand and salt. The waste line sometimes extends hundreds of metres to a central sump, so we run it in larger diameter pipe and follow the land's natural slope.
Taima lies in the desert part of Jahra governorate, where soil is sandy and buildings are spaced well apart from one another.
We test every water line under continuous flow for one hour to confirm pressure does not drop due to sand or distance.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, copper in sand and groundwater corrodes, so we sleeve it inside a thick plastic protection pipe. Protection adds cost but prevents pin-holes and leaks after years of service.
We use a pressure tank or secondary pump at mid-distance to re-boost pressure. We calculate pressure drop over the pipe length and choose the right diameter or add equipment as needed.
