Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in in Wafra Agricultural begins with understanding how farm buildings and plots spread across wide land. We run hot and cold supply from the roof tank or main pump to every bathroom outlet point. We plan pipe runs and falls for waste before walls close. Every joint is tested under pressure to confirm no leaks will form under tiles.
Farm buildings and poultry sheds in Wafra Agricultural sometimes sit far from the main structure, which means long supply runs that lose heat in cold weather. We choose larger or insulated pipes based on distance, and ensure waste has constant fall even over tens of metres. A floor trap near the bathroom is first choice, but if none exists we run the waste pipe to a treatment pit away from the cultivated zone.
Wafra Agricultural in Ahmadi governorate is a farming and poultry zone where buildings spread across large land holdings.
Every long supply run is tested at full flow for ten minutes before covering, because small leaks often show only under working pressure.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, heat loss increases with distance, especially at night and in winter. We recommend foam insulation or copper pipes instead of plastic for exposed sections of the run.
We run a waste pipe of proper size from the bathroom to a distant treatment pit, ensuring a steady fall of at least 2cm per metre. We test flow with heavy water discharge before sealing.
