Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in at Shuaiba Industrial starts by understanding the layout of worker housing blocks and each unit's distance from the main drain line. We run supply and waste pipes before walls close and check fall, clearance and access ports carefully.
Most worker housing at Shuaiba is rapid-build repetitive units with small bathrooms squeezed between tight walls and concrete floors poured solid. We use flexible pipe where space is tight and fit inspection chambers under floors because later maintenance will need quick access. Near Shuaiba Co-op these units cluster, and each bathroom outlet must rise slightly before dropping toward the main line.
Shuaiba Industrial lies in Ahmadi governorate near the KIPIC petrochemical complex, where temporary worker housing is dense.
Every supply and waste line is tested at full flow and results recorded before walls close because repairs later will be costly.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Because repetitive worker housing needs quick periodic maintenance. The chamber lets us clear blockages without lifting the floor or breaking tiles.
Yes, if rated correctly and secured to supports. We test the fall before handover to ensure water does not sit static.
