Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom rough-in in Waha requires careful study of tank and heater placement on the roof and their distance from each bathroom in the building. We plan supply and waste pipes to reach every fixture point before walls are sealed. Pressure and leaks are tested before finishing.
Most Waha properties near Waha Co-op are similar-design villas and townhouses. On these buildings roof space is limited, so we arrange tank and heater placement to save room and cut pipe lengths. Where there is a ground-floor guest bathroom, we add a vent point near the floor trap so the line can be checked from above.
Waha sits in Jahra governorate, a planned residential district near co-operative services where fast-track building is common.
After pipes are buried, walls are filled with clean sand to protect every joint from direct pressure.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install all pipes and fixtures before insulation and finishing start. Everything is pressure-tested under full pressure for at least an hour to catch any defects early.
Yes but we keep them slightly apart to prevent heat transfer from hot to cold. We wrap the hot line with foam insulation where it runs close to cold supply.