Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom rough-in in Naeem focuses on precise distribution of hot and cold water from tank and heater to every point before walls close. We plan pipe routes to avoid unnecessary crossings and bury them fully protected. Every drain line is tested with running water before handover.
Naeem is an emerging residential area with new villas and recent subdivisions near Naeem Co-op. New construction simplifies planning because walls are free of old pipework. We install supply lines at uniform diameters based on bathroom count and storeys, adding vent points at high locations. Drainage collects in main branches that slope steadily toward the main sewer line.
Naeem sits in Jahra governorate, where rapid organised development allows clean first-time rough-in without rework.
All drain lines are tested under full water flow for five minutes to confirm steady slope at every point.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes in Naeem where construction is modern and walls are easily protected. We use pressure-rated polypropylene for hot and cold supply. Drain pipes are PVC at diameter sized for the discharge volume.
We size the main supply line based on bathroom count and storeys. Secondary branches run from the main point to each bathroom at smaller diameter. Pressure is tested at the highest fixture to confirm adequacy.
