Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Jahra
Kitchen first-fix in Waha starts with surveying the new house and marking sink position, then running lines from the main meter. We separate hot and cold supply with adequate spacing and install the waste with even gradient. Every pipe is water-tested before wall closure.
Most Waha houses are medium-sized with enclosed kitchens and bathrooms near the main drain line. This means waste lines from the kitchen can be short and straightforward to install. We focus on ensuring the vent line passes through the outer wall before closure and is not bent at sharp angles, as that traps air inside. The supply line is wrapped with foam to prevent condensation on cold pipes.
Waha is a quiet residential neighbourhood in Jahra governorate where private houses have internal courtyards and shorter pipe runs.
Every threaded joint is tested with soapy water after filling to confirm no air leaks from the insulated pipes.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Roof exit is preferred where possible as it avoids condensation and humidity issues. A wall exit works too but must be above any adjacent bedroom window to prevent odours.
Separate pipes are essential because hot water needs different material and better insulation to prevent heat loss. In a small kitchen we support the hot line near the ceiling and the cold line near the floor to prevent thermal interference.
