Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix plumbing in Dajeej, at the desert fringe, faces unique challenges because soil is sandy and groundwater sits very deep. We excavate deep foundations for houses and must shield supply lines with extra protection from sand scour. Drain lines reach a deep underground pit that allows water to seep slowly through sand. Before capping each line, we fill it with water and wait two days to check for level drop.
Houses in Dajeej are spread far apart on large plots, and land naturally slopes toward desert depressions. This allows the underground pit to sit at the lowest point on the plot, collecting all waste water by gravity alone. We dig the pit five or six meters deep and clear out large stones, then fill lower layers with porous gravel and rocks to improve percolation. Drain lines from the house run straight to the pit on steady fall without interruption.
Dajeej is a desert-fringe area in Farwaniya where soil is sandy, population density is low and municipal drain networks do not exist.
We test drain lines by filling the pit with water and observing seepage rate for hours because sand density varies with depth.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
One pit is enough if the plot allows placement at the lowest point and soil is porous. We test percolation first by filling the pit, and if seepage is too slow we add a second pit in a different location.
Yes, so we line the pit with perforated brick or concrete ring to withstand lateral pressure from sand. The holes let water in while the wall prevents collapse and sand intrusion.