Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Capital
First-fix plumbing in Dasma starts with reading the building plan and locating kitchens, bathrooms and living areas before concrete is poured. We run main supply and drain lines under the slab and up through walls, maintaining steady falls for all waste. Every line is pressure-tested and air-tested before walls close and tiling begins.
Most Dasma residential buildings are multi-storey with modern kitchens on the ground floor and bathrooms spread across each level. All waste lines must fall from the top floor to the main drain pit below, which means calculating at least one centimetre drop per metre on every bathroom line. We size each pipe diameter based on how many fixtures feed it and how many storeys it serves.
Dasma is an established residential district in Kuwait City, where narrow streets and multi-storey apartment buildings require deep foundations and safe drainage routes.
Before closure, every drain line is filled with water and held under pressure for ten minutes to confirm no leaks at joints.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use water levels and measuring tape on each pipe section, recording height and drop at every metre. Our notes confirm each fall maintains steady flow without water pooling or backing up.
We run a larger-diameter main drain line from the foundation to the pit with a steady fall and test it before soil is backfilled. Flexible plastic pipes make routing around foundations and obstacles easier to do right.