Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Ahmadi
Drain-line layout in Ahmadi Stables starts before the concrete slab is poured. We run waste pipes from the horse shelters and service areas toward the main collection tank. Every line is set to a fall of at least one-in-one-hundred. We flush each line with water before burying it in soil.
Horse shelters and the adjacent stable spread over a large site, each with its own water and waste point. We plan drain routes from every shelter cluster sloping steadily toward one main line. Cleaning-out access points are fitted at bends and junctions because long waste runs need regular inspection points. The fall must be consistent from start to finish, as any change or flatten in the slope leaves deposits trapped in the pipe.
Ahmadi Stables lie in Ahmadi governorate, where large grounds are set aside for horses and a racing track.
Every drain line is tested by pumping water at low pressure for two hours before burial because fixing a leak after backfill means digging up a wide area.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We survey the site with a level before planning. If the ground slopes naturally we use that slope, but if it is level we place the collection tank at the lowest point and raise all other lines toward it.
Yes, every access point gets a metal cover fitted tight and sealed against surface water entry. The cover sits flush with soil or pavement level so it can be reached without extra digging.
